Seashell Energy Inc.

ANSAN WIKFS Gold Project

Adwait area -,Serakoit – Gabatilo Concession, Sudan .
This mining Project aims for the Production of 1,444 kg of Gold.

Project Details:
– Partner:
ANSAN WIKFS (Sudan) Ltd
– Concession Blocks: Serakoit block (Block – 6) and Gabatillo block (block – 13)
– Concession Location: Red Sea Hills
– Concession Area: 13,000 km2
– Project Status: Pre-Feasibility Study (PFS)
– Lifetime: Based on 14.583 years mine life with a crusher feed target of 656,250 tons.

The presence of auriferous ore with a gold content of 2.2 g/ton or more.

– Formulation of a mining plan.
– Choosing the mining equipment.
– Formulating a processing flow sheet.
– Choosing the processing equipment.
– Securing a water source as near to the processing site.
– Choosing and recruiting the right staff.
– Securing a mobile camp.
– Carrying out a simple detailed feasibility study.
– Recommendation of implementation the Ansan-Tumala project.
– Knelson 20 ton/hr plant capacity was recommended.
– A second plant may be installed later at Kluleit north artisanal mine. Shallow and dip drilling should precede the mining operation to confirm the grade and depth.
– Gravity separation method is recommended.